
Intro — Secondary dwelling approvals have doubled in Adelaide metro since 2022. The slab is the most technically complex part.
What makes a granny flat slab different from a shed slab?
The soil classification step (AS 2870 — A/M/H1/H2 classes across Adelaide)
Cost guide 2026
Council approval steps — Development SA lodgement, 30-day typical timeline
Case study preview — Elizabeth, AS 2870 Class H2, 150 mm edge beams, 3-day preparation + 1-day pour (links to Case Study 5 when published)
Our role — we pour from the engineer's certified drawings; we do not design (important trust/liability note)
CTA — Free on-site assessment; we can recommend structural engineers
Internal links: /concrete-slabs-adelaide, /services/concrete-slabs/elizabeth, /blogs/concrete-slab-cost-adelaide, /about-us
Planning a concreting project at your Adelaide property? Explore our specialized services: